The document your auditor will pull first.

Switch tabs to see one of four deliverables — a PM procedure, a LOTO card, a weekly safety talk, and the live AI chat answering a floor question from the same library. Click any tab to preview it.

Revisions dated, every change audit-trailed.
PDF, Markdown, and CMMS-ingestible JSON.
PM-SOP-024 · Rev CIssued 2026-03-14

Preventive Maintenance · Hydraulic Press H-200

Frequency
Every 500 hrs / 30 days
Est. downtime
22 minutes
Trade
Maintenance Tech II
PPE
Cut-A gloves, safety glasses, steel toe

1. Lock out / tag out per LOT-014 (hydraulic + electrical isolation).

2. Verify zero pressure on accumulator; bleed to ≤2 psi.

3. Inspect ram seals for extrusion; replace if measured gap > 1.2 mm.

4. Sample hydraulic fluid; if particle count > ISO 18/16/13, schedule flush.

5. Cycle press three times at 30% tonnage; log pressure trace on Sheet 24.B.

Related industries

Find the right safety documentation for your plant.

Explore the same practical, revision-ready approach across the industries Helmsmith supports.

See pricing
Ready for the next OSHA walk-through?

Stop inheriting the last welder’s laminated hot-work card.

Get a 1910.147 lockout/tagout procedure on every energy source behind the welders, plasma table, grinders, press brake, ironworker, fume extractor, and bridge crane; a 1910.215 abrasive-wheel SOP with the bench-grinder ring-test cadence your shop actually follows; an AWS Z49.1 WPS / 1910.252 hot-work permit SOP that cross-cites your LOTO library; a press-brake + ironworker operator certification matrix; a per-welder authorization matrix (MIG / TIG / stick / plasma) by process and base metal; and an OSHA 300 with the welding-flash / burn entries an auditor opens first. The program sits next to your machine shop documentation, your forklift program, and your food & beverage plant documentation under one revision log, with every procedure cross-cited by tag — and back to your OSHA written-procedure library.